Started poppin holes in the rear caliper bracket the other day. May go for the swiss cheese look but I haven't decided yet.
Tank needs a rear mount and it will be complete. Bars are done. Front legs need to be shaved. and I'll mount the fender next.
Got the front cross member tacked in Sun. night. This is where the rack and control arms will mount in the near future.
Wednesday, November 18, 2009
New powerplant for the rigid came yesterday...
Monday, November 16, 2009
Brake side of the new bike.
Finished the Y-pipe for my Dakota Saturday morning.
Alot more tube work needs to be done on the Datsun.
Got the dash cut and fit around the A pillar bars in the Datsun Sunday night.
Friday, November 13, 2009
Made the two-inda-one piece for my Y-pipe I'm building for the Dakota. Kind of a step by step without any real instructions of how I went about doing this.
Thursday, November 12, 2009
Don't look at the light!
A shot of the gear set out of a 4speed Datsun trans case.
Tig welds on the tank for the new bike
Loud ass things that pass for exhaust on the green bike.
TO THE MOON!
Got the Moon disc in yesterday.
Welded the dutz tabs on two of the steel wheels last night and hope to get the other two done tonight. These are what gives any land speed car the "look" in my book.
Tuesday, November 10, 2009
Road up into Ky Saturday with dad to look at a Plymouth Suburban. Took the back roads all the way to Hazard. This is coming down off one the mountains. It was weird seeing things that hadnt been touched since the 70's.
Little slip lead to 8 stitches on Friday
Friday, November 6, 2009
Open for business. Racecar fab from suspension and roll cages, Motorcycle fab, and Commercial furniture all custom built to order.